D.G. & G.G. (Diesel & Gas Generator) Installation

D.G. & G.G. Installation includes the supply, positioning, electrical integration, and commissioning of diesel and gas-powered generators for reliable backup and prime power. The process ensures uninterrupted energy supply for critical systems across commercial, industrial, and infrastructure environments. From load assessment and site preparation to exhaust system setup and control panel configuration, each installation adheres to safety and regulatory standards. These generators are essential for maintaining operations during grid outages or peak demand. Ideal for hospitals, data centers, factories, residential complexes, and telecom installations.

Load Analysis & Generator Selection

Assessing power requirements to recommend the right diesel or gas generator capacity, brand, and configuration.

Civil & Structural Setup

Foundation construction, anti-vibration mounting, fuel system layout, and exhaust design tailored to site needs.

Electrical Integration

Connection to LT/HT panels, AMF/ATS panels, earthing, cabling, and synchronization with existing power infrastructure.

Testing, Commissioning & Handover

Operational testing, fuel efficiency checks, safety verification, and handover with complete documentation and user training.

End-to-End Electrical Consulting Process

Strategic Planning to Smart Execution
Requirement Analysis

Requirement Analysis

Evaluate client needs, project scope, and site conditions to define clear electrical goals and deliverables.

Step 01

System Design & Planning

System Design & Planning

Create detailed electrical design documents, drawings, and component specifications tailored to project needs.

Step 02

 Technical Advisory & Supervision

Technical Advisory & Supervision

Guide installation, procurement, and contractor coordination to ensure quality and performance during execution.

Step 03

Inspection & Optimization

Inspection & Optimization

Perform final audits, suggest improvements, and provide post-installation support for peak system performance.

Step 04

our valuable clients

  • delhi-metropolitan-education
  • delhi-world-school
  • gulf-petrochem
  • hcl-technologies
  • ienergizer
  • Nirala World
  • interglobe-education
  • shree-ji
  • its-engineering-college
  • /voltas-limited
  • its-dental-college
  • kajaria
  • vivo
  • deepakbuilders
  • arabtec
  • knight-frank
  • oberoi-hotel-and-resorts
  • centaur-hotel
  • tech-mahindra
  • ahrr
  • cs-electric
  • vijay-nirman-company-pvt-ltd
  • motherson-sumi-systems-lmt
  • neumann
  • airport-authority
  • sunwoda
  • nuberg-epc
  • dljm
  • tech-india
  • synopsys
  • wave-one
  • capgemini
  • jubilant-biosys
  • tata-power
  • maruti-suzuki
  • fortis-hospitals
  • aplapollo-piping-systems
  • ultratech-cement
  • sikka